Power Plant in Turaif
Power Plant in Turaif
Surface Preparation and Painting work has been done at Client Plant Site.
Surface Preparation and Painting of Twenty Five (25) Km Pipe Various Sizes 2″, 4″, 8″ and 10″. Surface Preparation and Painting of Steel Structure Two Hundred (200) tons.
Report:
- Client Coordination
- QC Reports
- Inspection Assistance
- Progress Reporting
- Logistics all included in our scope
Scope:
- Surface Preparation
- Industrial Painting & Coating
Categories
- Mechanical
End User
- Abener Energia, S.A.