Scope:

  • Design
  • Engineering
  • Supply
  • Fabrication
  • Construction
  • Installation
  • Termination
  • Testing and Commissioning assistance
Project Description

Design, Supply, Installation and Commissioning of Nitrogen Purging System.
Design, Supply, Install and Commission Complete RTR Piping System.
Supply, Install, Calibrate and Commission approximately two Hundred (200) Field Instruments including Temperature, Pressure and Flow Transmitters.
Supply, Install and Commissioning more than hundred (100) drain valves.
Supply, Laying and Termination of (more than 20km) Power & Instrument Cables and accessories for the same. Supply, Installation & Termination of Field Junction Boxes.
Extensive Control Room Modifications: Removal of Existing Cabinets and Installation of New Cabinets and Operator Consoles.
Loop Testing & Commissioning and Startup Support.