Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility.

Seven (7) Kilometer 36″ Pipeline from Ghazlan Power Plant.

Report:

  • Client Coordination
  • QC Reports
  • Inspection Assistance
  • Progress Reporting
  • Logistics all included in our scope
Scope:

  • Surface Preparation
  • Industrial Painting & Coating

Categories

  • Mechanical

End User

  • Saudi Aramco