Gas Corridor Project
Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility.
Tweleve (12) Kilometer 24″ Pipeline from GAS Plant to SAB Tank.
Report:
- Client Coordination
- QC Reports
- Inspection Assistance
- Progress Reporting
- Logistics all included in our scope
Scope:
- Surface Preparation
- Industrial Painting & Coating
Categories
- Mechanical
End User
- Marafiq