Project Title: Revamp of Nitrogen Supply and Purging Process @ SADAF Chemical Plant
Client: Schneider Electric
End User: SADAF (SABIC)
Scope: Design, Egineering, Supply, Fabrication, Construction, Installation, Termination, Testing and Commissioning assistance
Design, Supply, Installation and Commissioning of Nitrogen Purging System. Design, Supply, Install and Commission Complete RTR Piping System. Install, Calibrate and Commission approximately two Hundred (200) Field Instruments including Temperature, Pressure and Flow Transmitters. Supply, Install and Commissioning more than hundred (100) drain valves. Supply, Laying and Termination of (more than 20km) Power & Instrument Cables and accessories for the same. Supply, Installation & Termination of Field Junction Boxes. Extensive Control Room Modifications: Removal of Existing Cabinets and Installation of New Cabinets and Operator Consoles. Loop Testing & Commissioning and Startup Support.
Project Title: Revamp and Upgrade of Power Management System (CCMS) @ ARAQA PALACE (Home of King Salman bin Abdulaziz)
Client: Honeywell Building Solutions
End User: Saudi Bin Laden / ARQA Palace
Scope: Design, Engineering, Supply, Configuration, Integration, Installation, Termination, Testing and Commissioning
Complete Upgrade of existing Power Management System (CCMS) at Arqa Palace (Home of King Salman bin Abdulaziz). Design, Procurement, Software Development, Panel Integration, Site Installation, Commissioning & Hot cutover. System Installed is based on Honeywell Master Logic 200 High Speed PLCs & Honeywell Experion SCADA based Control System. Scope of work includes upgrading of complete Network and Configuration of the same. Network Systems and protocols include Modbus/RS-485, TCP/IP Ethernet/ Fiber Optic etc. Critical Testing and Commissioning of the systems area-wise with limited time availability for this purpose.
Project Title: Ebara Pumps Facility Project:
Client: Arab Tech
End User: Ebara Pumps
Scope: Design, Supply, Fabrication, Integration, , Construction, Erection, Installation and commissioning scope including:
Complete Scope of Civil Work & Structure, Foundations ,Factory Shed, Office Building. Electrical: All Electrical Panels, lighting System, Cable Trays, Conduits, Cabling, Grounding, Lightning Protection, Backup Generator 400KVA & ATS Panel. Electrical Duct banks, Manholes and Hand holes etc. Low Current Systems: Fire Alarm System, CCTV, Access Control, Telephone, Data and Networking. Compressed Air System: Supply, installation and Testing of complete piping. Water Systems: Supply, Installation and commissioning of Industrial Water, Domestic Water, Sewerage System and Irrigation System. Including: Pumps , all associated piping, Pipe fittings and Supports. Installation of Plant Equipment and Skids. Testing & Commissioning
Project Title: DCIS Revamp at Ghazlan Power Plant
Client: Honeywell Process Solutions
End User: Saudi Electricity Company
Scope: Design, Supply, Fabrication, Dismantling, Construction, Installation, Terminations, Testing, Commissioning and Maintenacne Support
Dismantling of Existing DCS System and Installation of New DCS Systems for 4 Turbines. Work Included Removal of approximately Hundred (100) Control System & Marshalling Cabinets and Installation of New Cabinets. Integration, Supply, Installation, Termination and Commissioning of Electrical Panels. Installation of Operator Consoles, Server Cabinets and associated Furniture. Laying, Termination and Testing of Extensive Power Cables, Signal Cables, Network Cables, Fiber Optic Cables. Supply, Installation, Testing and Commissioning of Field Instruments. Dismantling, Re-Construction, and Renovation of Control Room, Rack Room and Engineering Room Trench Excavation & Back filling Duct Banks and Man/Hand holes for FO Cable Laying. Extensive Loop Testing, Commissioning and Startup Support.
Project Title: Hawaiya Contractors Park Water Tank Farm & Sewage Treatment Plant
Client: Tamimi Global
End User: SAUDI ARAMCO
Scope: Design, Engineering, Supply,Configuration, Integration, Construction, Installation, Termination, Testing and Commissioning

Installation, Testing and Commissioning Assistance for Water Tank Farm Control System. Assistance in Fabrication & Installation of Waster Tanks. Surface Preparation (Sand Blasting) and Painting of Water Tanks of Water Tank Farm. Painting Work conducted at site. Installation, Calibration & Commissioning of complete Field Instrumentation. Supply, Installation, Laying & Termination & Commissioning of Cable Trays, Power Cables and Instrument Cables etc. Supply, Integration and Commissioning of Control System for Sewage Treatment Plant (STP). Loop Testing and Commissioning of Water Tank Farm Systems. Loop Testing and Commissioning of Sewage Treatment Plant Systems.

Project Title: Supply of Control System for RO plant @ King Abdullah Petroleum Studies & Research Center (Saudi Aramco)
Client: Isam Kabbani
End User: Saudi Aramco / King Abdullah Petroleum Studies and Research Center
Scope: Design, Supply, Integration, Installation, Testing and Commissioning

Control System for at Pre-RO Water Treatment Plant @ King Abdullah Petroleum Studies and Research Center (KAPSARC) Riyadh: Design, Supply, Integration, commissioning & Start-up of Honeywell HC900 PLC & Experion SCADA based control system for the treatment of Water at Pre-RO plant.

Project Title: A360 DCS Upgardes
Client: Honeywell Process Solutions
End User: YANPET (SABIC)
Scope: Design, Supply, Fabrication, Dismantling, Construction, Installation, Terminations, Testing, Commissioning and Maintenance Support A360 DCS Systems Upgrade at YANPET Petro Chemical Plant (3 Year Project and Maintenance Services)

DCS Upgrade at ten (10) plants of the Large Petrochemical complex. Scope included: Dismantling of DCS, RIO, Marshalling, Network and Server Cabinets and Installation of New Cabinets for the same. Upgradation of all CCRs Consoles Work Stations. Installation of Operator Consoles, Server Cabinets and associated Furniture. Laying, Termination and Testing of Extensive Power Cables, Signal Cables, Network Cables. Laying of Fiber Optic Network through out the plant. Trench Excavation & Back filling Duct Banks and Man/Hand holes for FO Cable Laying. Merging of various Controls rooms into one. This includes relocation of Consoles and Cabinets. Laying of New cables and demolition of various equipment and furniture. Extensive Loop Testing, Commissioning and Startup Support.

Project Title: Revamp and expansion of Chemical Labs at Maaden Smelter Plant
Client: Maaden Smelter Plant (Ras ul Khair), Maaden
Scope: Design, Supply, Construction, Fabrication, Installation, Testing and Commissioning (LSTK Basis)

Mechanical Fabrication and Erecting of shelter structure: Civil Scope: Floor tile modification (outdoors); This includes supply installation of SS tubing and manifolds, Fabrication and installation of shelter for the gas cylinders (outdoors), modification of floor for the shelter (outdoors), modification of test benches inside the analyzer lab etc.

Project Title: Yanbu, Al Badar, Khyber and Sixteen (16) other towns and districts in Medinah Province
Client: Signify - Philips, NESCO
Scope: Survey, Supply, Fabrication, Dismantling, Installation, Termination, Testing and Commissioning

Revamping Street Lighting System ofMedinah Province from Conventional Lighting System to LED Energy Saving Lighting System: Under the 2030 vision of Saudi Government (NESCO) Street Lighting system of entire Saudi Arabia is being changed from Conventional lighting to Energy Saver lighting system. Experts Arabia is working as one of the main contractor for this prestigious project. Scope of work include City survey and data collection. Replacement of lighting Fixtures. Delivery of removed fixtures to Municipality designated warehouses. LUX measurement. Logistics and management of supplied lighting fixtures in bulk quantity from the respective Supplier Energy Saving Company (ESCO). We have already conducted surveys in nineteen (15) Towns and cities and completed 70% replacement of Street Lighting fixtures in these Cities / Towns. (Work in Progress)

Project Title: Supply, Installation and Commissioning of Weather Station for Petrokemya Plant (SABIC)
Client: Petrokemya (SABIC)
End User: Petrokemya (SABIC)
Scope: Design, Engineering, Supply, Configuration, Integration, Installation, Termination, Testing and Commissioning (LSTK)

Design, Supply, Software Development, Integration, Installation, Testing and Commission of weather Station at Petrokemya Plant. The supply include weather sensors and monitoring System from world renowned Company Vaisala of Finland. Scope of work included design, Supply, integration, construction, installation, Testing and Commissioning of Weather Station.

Project Title: Replacement of Burner Management System (BMS) at MTBE Plant Ibn Zahr (SABIC)
Client: Honeywell Process Solutions
End User: Ibn Zahar (SABIC)

Replacement of Existing Relay based system w/ Honeywell Safety Manager ESD System. Supply, Installation, Commissioning of SIL3 Valves at 12” Line. Pipe Modification and Tapping Point and Installation of Valves. Supply, Installation, Calibration & Commissioning of SIL3 Transmitters; Fabrication and Installation of Instrument Supports. Supply Installation. Supply and Installation of Flame Scanners. Supply and Installation of Isolation Valves. Supply, Installation of Cable Trays and Conduits in the field. Trench Excavation & Duct Banks. Supply, Laying & Termination of Power & Signal Cables. Installing New BMS System Cabinets and Consoles in the Control Room & Rack room. Loop Test & Commissioning and Startup Support.

Project Title: Upgrade of Manual Fire Water Tank Control to Automated Control @ DRD Area at HADEED Steel Plant – SABIC
Client: Hadeed (SABIC)
End User: Hadeed (SABIC)
Scope: Design, Supply, Construction, Fabrication, Installation, Testing and Commissioning (LSTK Basis)

Design, Supply Installation and Commissioning of Complete Package to Automate Fire Water Tank. Scope includes design, Supply, Calibration, Installation, Testing & Commissioning of Field Instrumentation Package. Utilizing Laser Guided Radar Type Level Sensing Methodology. Supply and Installation of all associated cabling, Cable Trays Junction Boxes and accessories for. Tie-in with existing DCS System. Loop Testing, Commissioning & Start-up Support. Also provided Maintenance support for the above after successful commissioning.

Project Title: Replacement of Safety System at 2EG Plant Sharq (SABIC)
Client: Schneider Electric
End User: Sharq (SABIC)
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
Replacement of Existing ESD System with Invensys Triconex ESD System. Massive amount of Demolition and Installation work conducted during short Shutdown Period. Appropriate Planning was done and all procurement made timely. Pre-Shutdown period has been well utilized all activities that could be done during pre-shutdown has been completed. Twenty Eight (28) cabinets replaced during 10 days shutdown period.
Project Title: Supply & Commissioing of Control Systems for Hawaiya Contractors Park STP & WTP (Saudi Aramco)
Client: Tamimi Global
End User: SAUDI ARAMCO
Scope: Design, Engineering, Supply,Configuration, Integration, Construction, Installation, Termination, Testing and Commissioning
” Installation, Testing and Commissioning Assistance for Water Tank Farm Control System. Assistance in Fabrication & Installation of Waster Tanks. Surface Preparation (Sand Blasting) and Painting of Water Tanks of Water Tank Farm. Painting Work conducted at site. Installation, Calibration & Commissioning of complete Field Instrumentation. Supply, Installation, Laying & Termination & Commissioning of Cable Trays, Power Cables and Instrument Cables etc. Supply, Integration and Commissioning of Control System for Sewage Treatment Plant (STP). Loop Testing and Commissioning of Water Tank Farm Systems. Loop Testing and Commissioning of Sewage Treatment Plant Systems. ”
Project Title: Revamping Street Lighting System at Jubail Industrial City
Client: Tazez Advanced Ind. Co. Ltd. / Quantum ESCO LLC
EndUser: NESCO
Scope: Dismantling, Installation, Termination, Testing and Commissioning

“Revamping Street Lighting System of Jubail City from Conventional Lighting System to LED Energy Saving Lighting System:
Under the 2030 vision of Saudi Government (NESCO) Street Lighting system of entire Saudi Arabia is being changed from Conventional lighting to Energy Saver lighting system.
Experts Arabia is working as one of the main contractor for this prestigious project.
Scope of work include City survey and data collection. Replacement of lighting Fixtures. Delivery of removed fixtures to Municipality designated warehouses. LUX measurement. Logistics and management of supplied lighting fixtures in bulk quantity from the respective Supplier Energy Saving Company (ESCO).

Project Title: Replacement of Intrinsic Safety (IS) Marshalling for Honeywell DCS & Triconix Safety System at VCM Plant Petrokemya (SABIC):
Client: Honeywell Process Solutions
End User: PetroKemya (SABIC)
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
Scope of project includes FEED, Design, Supply, Assemble, Integrate, Install and Commission New Marsalling w/ IS Barrier and Signal Splitter Cabinets for the Honeywell PKS DCS & Triconex ESD system; Scope also includes Supply of Power Distribution Cabinet, Revamp and relocation of Engineering & Control Room, Supply laying and Termination of Multi-pair cables etc.
Project Title: Supply of Electrical, Instrument, CCTV & Heat Tracing System flare System @ Shadgum Gas Plant
Client: Zamil
End User: SAUDI ARAMCO
Scope: Design, Engineering, Supply,Configuration, Integration, Construction, Installation, Termination, Testing and Commissioning
Design, Supply & Installation of Electrical, Instrument, CCTV & Heat Tracing System for Flare Tip. Scope includes Supply & Installation of Conduits, Cable Laying & Termination, Supply, Integration and Installation of JBs & PDB, Field Instruments, CCTV Camera. Installation of Ignition Panel, Heat Tracing System . Loop Test & Commissioning
Project Title: Upgrade of PLC based Alarm System @ Jumaiya Tank Farm (Saudi Aramco)
Client: Isam Kabbani
End User: Saudi Aramco
Scope: Supply, PLC hardware and software application modification and update, Installation, Online Application upgarde & Testing and Commissioning Control System Upgrade Project @ Jumaiya Tank Farm (Ras Tanura):
“Upgrade of Modicon 984 PLC based Control System @ largest Offloading terminal in KSA. Scope include incudes design, modification and addition of Application Logic. Implementation in the actual Site PLCs (running Critical Application) online. “
Project Title: Supply of Control System for NALCO Champion Chemical Plant
Client: NALCO Champion Chemical Plant
End User: NALCO Champion
Scope: Design, Engineering, Supply,Configuration, Integration, Testing and Commissioning
Design, Supply, Software Development, Integration, Testing and Commission of PLC based System for NALCO Champion Chemical Plant. The System is based on Honeywell Control Edge PLC and Experion HMI system. This is the first Supply and installation of Honeywell Control Edge PLC system in Kingdom of Saudi Arabia
Project Title: Supply & Upgarding of PLC System for Marafiq Sea Water Cooling Facility
Client: Xsmart
End User: MASA / MARAFIQ
Scope: Supply,Configuration, Integration, Testing and Commissioning
Supply, Integration, Testing and Commission of PLC based System for Pumping station at Seawater Cooling Facility Plant for Marafiq. The System is based on LG Based PLC system.
Project Title: Upgradation of Boilers Monitoring Systms @ SADAF Petro-Chemical Plant:
Client: Abhassain
End User: SADAF (SABIC)
Scope: Design, Egineering, Supply, Fabrication, Construction, Installation, Termination, Testing and Commissioning assistance
Upgradation of Boiler Monitoring Systems of Four Boilers. Forty (40) Fire Scanners replaced at Boilers. Scope included Design, Supply, replacement of Fire Scanners, cables & conduits, Junction Boxes all other accessories on LSTK basis. Loop Test & Commissioning
Project Title: Replacement of Safety System at 3EG Plant Sharq (SABIC)
Client: Schneider Electric
End User: Sharq (SABIC)
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
Replacement of Existing ESD System with Invensys Triconex ESD System. Massive amount of Demolition and Installation work conducted during short Shutdown Period. Appropriate Planning was done and all procurement made timely. Pre-Shutdown period has been well utilized all activities that could be done during pre-shutdown has been completed.ESD cabinets replaced during shutdown period.
Project Title: Revamp of Field Instrument and DCS system at Ethelene Plant SADAF (SABIC)
Client: Honeywell Process Solutions
End User: SADAF (SABIC)
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
” Replacement of Existing DCS with New Honeywell PKS DCS System. Dismanteling of around 50 Transmitters and Valves in the Field. Installation of around 50 New Transmitters and Valves. Supply and Installation of Cable Trays and Conduits. Supply and Laying and Termination of Power and Instrument Cables. Loop Test & Commissioning and Startup Support. ”
Project Title: Revamping Street Lighting System of Medinah City
Client: Signify - Philips
End User: NESCO
Scope: Survey, Supply, Fabrication, Dismantling, Installation, Termination, Testing and Commissioning
“Revamping Street Lighting System of Medinah City from Conventional Lighting System to LED Energy Saving Lighting System: Under the 2030 vision of Saudi Government (NESCO) Street Lighting system of entire Saudi Arabia is being changed from Conventional lighting to Energy Saver lighting system. Experts Arabia is working as one of the main contractor for this prestigious project. Scope of work include City survey and data collection. Replacement of lighting Fixtures. Delivery of removed fixtures to Municipality designated warehouses. LUX measurement. Logistics and management of supplied lighting fixtures in bulk quantity from the respective Supplier Energy Saving Company (ESCO). ”
Project Title: Integration of DCS, ESD and other Cabinets for Jezaan Refinery Project
Client: Honeywell Process Solutions
End User: Saudi Aramco
Scope: Supply, Integration and Testing
“Jezaan Refinery Control Systems Integration (Honeywell DCS, Safety Systems, Marshalling, Network & Engineering Cabinets): Honeywell PKS DCS System Control cabinets, Marshalling Cabinets and Network Cabinets Assembly, Integration and Pre-FAT & FAT Support for Jezaan Refinery Project(Total No of cabinets: 1500 Plus) ”
Project Title: Upgarde of Control System for Gulf Industrial & Chemical Oil Co. Plant
Client: Gulf Industrial and Chemical Oil Co. (GCIR)
End User: Gulf Industrial and Chemical Oil Co. (GCIR)
Scope: Design, Engineering, Supply,Configuration, Integration, Testing and Commissioning
Design, Supply, Software Development, Integration, Testing and Commission of PLC based System for GCIR Plant. The System is based on Honeywell PLC and Experion HMI system.
Project Title: Industrial IT & Cyber Security Services via Out Sourced Engineers
Client: Yokogawa
End User: ARAMCO / SABIC / SEC / Maaden / Others
Scope: System Design, Configuration, Deployment, Testing and Commissioning of Industrial IT Systems
Experts Arabia have provided Specialist OT/IT Experts Engineers. Under this long-term contract these engineers provide Design, Configuration, Commissioning and Maintenance Support service related to OT/IT Cyber Security solutions, Server & Network Configuration and Deployment and other related services. These solutions and services are provided at various plants and facilities at SABIC, ARAMCO and other Major clients in Saudi Arabia.
Project Title: Installation and Commissioning of Fire Detectors & Fire Alarm System at NatPet
Client: Bin Zager
Client: NETPET
Scope: Survey, Supply, Fabrication, Dismantling, Installation, Termination, Testing and Commissioning
Installation of Fire & Gas Detectors at NETPET Plant. Fabrication of Instruments stands, Installation of Fire Detectors & Fire Alarm System, Installation of Conduits, Laying and termination of cables, Loop Testing & Commissioning Support.
Project Title: Honeywell DCS Upgrade at PP2 Plant Ibn Zahr (SABIC):
Client: Honeywell Process Solutions
End User: Ibn Zahr (SABIC)
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
Upgrade of Honeywell TPS DCS Upgrade to Honeywell PKS at PP1 plants. Scope includes include Assemble, Integrate & Testing of Network & Server cabinets Integration; Pre-FAT, FAT Support, Removal of Existing Cabinets & Consoles, Installation of New cabinets & Consoles, Cable Laying & Terminations, Loop Testing & Commissioning Support.
Project Title: Honeywell DCS Upgrade at PP2 Plant Ibn Zahr (SABIC):
Client: Honeywell Process Solutions
End User: Ibn Zahr (SABIC)
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
Upgrade of Honeywell TPS DCS Upgrade to Honeywell PKS at PP1 plants. Scope includes include Assemble, Integrate & Testing of Network & Server cabinets Integration; Pre-FAT, FAT Support, Removal of Existing Cabinets & Consoles, Installation of New cabinets & Consoles, Cable Laying & Terminations, Loop Testing & Commissioning Support.
Project Title: Honeywell DCS Upgrade at Khafji Joint Operations (KJO):
Client: Honeywell Process Solutions
End User: ARAMCO (KJO)
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
Upgrade of Honeywell TPS DCS Upgrade to Honeywell PKS at three plants at KJO. Scope includes include Assemble, Integrate & Testing of Network & Server cabinets Integration; Removal of Existing Cabinets & Consoles, Installation of New cabinets
Project Title: Supply, Installation and Commissioning of Control System and Instrumentation for Two (2 Furnaces):
Client: Saudi Power Transformer
End User: Saudi Power Transformer
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
Siemens S7 PLC based Control Systems. Scope of work also included installation of all field instruments, cable trays, Cable Laying & terminations. Loop Test & Commissioning
Project Title: Integration of DCS, ESD and other Cabinets for Kemya Plant (SABIC)
Client: Honeywell Process Solutions
End User: Kemya Plant / SABIC
Scope: Supply, Integration and Testing
“KEMYA Plant (SABIC) Control Systems Integration (Honeywell DCS PKS, Safety Systems & Network/Server): Assembly, Integration and Pre-FAT & FAT services of One Hundred & Fifty (150) Cabinets including Honeywell PKS DCS system, Safety System, network and server cabinets. ”
Project Title: Integration of DCS, ESD and other Cabinets for ARAMCO Plant (SABIC)
Client: Schneider Electric
End User: ARAMCO
Scope: Supply, Integration and Testing
“Assembly, Integration and Pre-FAT & FAT services of Fifty (125) Cabinets including INVENSYS DCS system, Safety System, network and server cabinets. ”
Project Title: Flame Scanners Upgrade for Boilers @ Petrokemya Petro-Chemical Plant:
Client: Saudi Power Transformer
End User: Saudi Power Transformer
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
Fire Scanners replaced at Boilers. Scope included Design, Supply, replacement of Fire Scanners, cables & conduits, Junction Boxes all other accessories on LSTK basis. Loop Test & Commissioning
Project Title: Revamping Street Lighting System in Eastern Region
Client: NESMA ELECTRIC - NESMA TELECOM & TECHNOLOGY
End User: NESCO
Scope: Survey, Dismantling, Installation, Termination, Testing and Commissioning
“Revamping Street Lighting System of Eastern Region (including cities of Ras Tanura, Qatif, Dammam, Khobar, Khafji & Narya) from Conventional Lighting System to LED Energy Saving Lighting System: Under the 2030 vision of Saudi Government (NESCO) Street Lighting system of entire Saudi Arabia is being changed from Conventional lighting to Energy Saver lighting system. Experts Arabia is working as one of the main contractor for this prestigious project. Scope of work include City survey and data collection. Replacement of lighting Fixtures. Delivery of removed fixtures to Municipality designated warehouses. LUX measurement. Logistics and management of supplied lighting fixtures in bulk quantity from the respective Supplier Energy Saving Company (ESCO). ”
Project Title: Revamp of Safety System at Hadeed Steel Plant (SABIC):
Client: Honeywell Process Solutions
End User: Hadeed (SABIC)
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
Replacement of Siemens Based Safety System to Honeywell Safety Manager at Hadeed Steel Plant. Scope includes include Assemble, Integrate & Testing of Network & Server cabinets Integration; Pre-FAT, FAT Support, Removal of Existing Siemens Cabinets, Installation of New cabinets & Consoles, Cable Laying & Terminations, Loop Testing & Commissioning Support.
Project Title: Replacement of Safety System at MTBE Plant Ibn Zahr (SABIC)
Client: Schneider Electric
End User: Ibn Zahar (SABIC)
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
” Replacement of Existing Yokogawa Safety System w/ Triconex ESD System. Supply, Installation of Cable Trays and Conduits in the field. Trench Excavation & Duct Banks. Supply, Laying & Termination of Power & Signal Cables. Installing New Cabinets and Consoles in the Control Room & Rack room. Loop Test & Commissioning and Startup Support. ”
Project Title: Upgrade of Float Glass Manfacturing Conveyer System
Client: Karina Arabia
End User: Gulf Guardian Float Glass Plant
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
“Dismanting of existing Field Instrumenation and Installation of New Field Instrumentation and sensors, Installation of Cable Tray and Conduits, Laying and Termination of Power and Instrument cables. Installation and Termintion of Allen Bradley PLC based Control Panel. Testing and Commissioning ”
Project Title: Installation of New Quinch Cooler at Saudi Chevron Plant (E&I Scope)
Client: Zamil
End User: Saudi Chevron Chemical Plant
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
“Supply, Installation, Testing and Commissioning of Field Instrumentation, Cable Trays, Conduits, Cables for the Installation of New Quinch Cooler at Saudi Chevron Plant. Scope of work also include installation termination of Field Junction Boxes and other electrical items.”
Project Title: Honeywell DCS Upgrade at Utility Plant SADAF (SABIC):
Client: Honeywell Process Solutions
End User: SADAF (SABIC)
Scope: Design, Supply, Integration, Construction, Installation, Termination, Testing and Commissioning on LSTK Basis
Upgrade of Honeywell TPS DCS Upgrade to Honeywell PKS at Utility Plant CCR. Scope includes include Assemble, Integrate & Testing of Network & Server cabinets Integration; Pre-FAT, FAT Support, Removal of Existing Cabinets & Consoles, Installation of New cabinets & Consoles, Cable Laying & Terminations, Loop Testing & Commissioning Support.
Project Title: Supply & Upgarding of PLC System at YANPET Plant (SABIC)
Client: YANPET / SABIC
End User: YANPET / SABIC
Scope: Supply,Configuration, Integration, Testing and Commissioning
Supply, Integration, Testing and Commission of PLC based Control System for the packaging Plant.
Project Title: Supply & Installation of PLC and HMI Based Control System for BCI Plant (SABIC)
Client: BCI Chemical Plant
End User: BCI Chemical Plant
Scope: Supply,Configuration, Integration, Testing and Commissioning
Supply, Integration, Testing and Commission of PLC & HMI Based Control System for Chemical Plant
Project Title: Revamping Street Lighting System at Al Baha and Northern Borders Region
Client: Tazez Advanced Ind. Co. Ltd. / Quantum ESCO LLC
End User: NESCO
Scope: Survey, Dismantling, Installation, Termination, Testing and Commissioning
“Revamping Street Lighting System of Northern Borders Region and Al Baha from Conventional Lighting System to LED Energy Saving Lighting System: Under the 2030 vision of Saudi Government (NESCO) Street Lighting system of entire Saudi Arabia is being changed from Conventional lighting to Energy Saver lighting system. Experts Arabia is working as one of the main contractor for this prestigious project. Scope of work include City survey and data collection. Replacement of lighting Fixtures. Delivery of removed fixtures to Municipality designated warehouses. LUX measurement. Logistics and management of supplied lighting fixtures in bulk quantity from the respective Supplier Energy Saving Company (ESCO). ”
Project Title: Supply & Upgarding of Truck Weight measurment System for Petrokemya Plant (SABIC)
Client: Himatrix
End User: Petrokemya / SABIC
Scope: Supply,Configuration, Integration, Testing and Commissioning
Supply, Integration, Testing and Commission of Rockwell PLC and Weigh Indicators based System for Truck Weight measurement
Project Title: Fabrication & Painting of Steel Structure
Client: Linde / SADARA
End User: Linde / SADARA
Scope: Supply, Fabrication, Surface Preparation, Industrial Painting & Coating
“Linde Gas Plant Sadara Complex Jubail (Fabrication, Surface Preparation and Coating/Painting of Steel Strcuture ): Supply, Fabrication of Steel Structure (1000 Tons), Surface Preparation and Painting of the Steel Structure. The fabrication and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Fabrication & Painting of Pipes & Spools
Client: Petron
End User: Saudi Aramco
Scope: Supply, Fabrication, Surface Preparation, Industrial Painting & Coating
“Saudi Armaco Upstream (Fabrication, Surface Preparation and Coating/Painting of Pipe Spools ): Supply, Fabrication of Pipes and Spools and Pipe Racks, Surface Preparation and Painting. The fabrication and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Painting of Water Storage Tanks
Client: Al Aythabi
End User: Fire Fighting Training Center - SABIC
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Two (2) Number Water Tanks Height 8 meters Diameter 15 Meters Surface Preparation and Painting work has been done at End User Location / Site. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Painting of Vessels
Client: MIS Arabia
End User: Saudi Aramco
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Ten (10) Number Vessels Height/Length 16 meters Diameter 10 Meters Surface Preparation and Painting work has been done at Client Fabrication Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Gas Corridor Project
Client: Sendan
End User: GAS Plant - SABIC
Scope: Surface Preparation, Industrial Painting & Coating
“Tweleve (12) Kilometer 24″ Pipeline from GAS Plant to SAB Tank Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Pipeline from Petrokemya North to SADARA
Client: Sendan
End User: Petrokemya North Petrochemical Plant - SABIC
Scope: Surface Preparation, Industrial Painting & Coating
“Tweleve (12) Kilometer 14″ Pipeline from SADAF (Petrokemya North) to SADARA Chemical Copmplex Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Painting of Water Storage Tanks
Client: AES Arabia
End User: Ministry of Housing
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Thirteen (13) Number Water Storage Tanks Height up to 10 meters Diameter upto 12 Meters Surface Preparation and Painting work has been done at Site Location. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Power Plant in Turaif
Client: Khaled Juffali Industrial Company (KJIC)
End User: Abener Energia, S.A.
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Twenty Five (25) Km Pipe Various Sizes 2″, 4″, 8″ and 10″. Surface Preparation and Painting of Steel Structure Two Hundred (200) tons. Surface Preparation and Painting work has been done at Site Location. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Aramco Plant in Turaif
Client: JGC Corp.
End User: Saudi Aramco
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Two (2) Telecom Towers Height 60 Meter and 80 Meter Respectively. Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Gas Pipeline from Ghazlan Power Plant to Rastanura Refinery (Saudi Aramco)
Client: Sendan
End User: Saudi Aramco
Scope: Surface Preparation, Industrial Painting & Coating
“Seven (7) Kilometer 36″ Pipeline from Ghazlan Power Plant Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Gas Pipeline Maaden Aluminum Plant (Ras ul Khair)
Client: Zamil Steel
End User: Maaden
Scope: Surface Preparation, Industrial Painting & Coating
“Five (5) Kilometer 6″ Gas Pipeline at Aluminum Plant. Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Painting of Storage Tanks
Client: Zamil Steel
End User: Saudi Aramco
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Thirty (30) Number Storage Tanks Height 12 meters Diameter 15 Meters Surface Preparation and Painting work has been done at Site Location. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Painting of Water Storage Tank Farm @ Hawaiya Contractor Park
Client: Tamimi Global
End User: Saudi Aramco
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Twelve (12) Number Water Storage Tanks Height up to 8 meters Diameter upto 15 Meters Surface Preparation and Painting work has been done at Site Location. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Painting of Tanks & Vessels
Client: MIS Arabia
End User: Saudi Aramco
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Fourteen (14) Number Storage Tanks and Vessels Height/Length 15 meters Diameter 10 Meters Surface Preparation and Painting work has been done at Client Fabrication Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: CS Pipeline Painting Project
Client: MCE Gulf
End User: Petrokemya North PetroChemical Plant - SABIC
Scope: Surface Preparation, Industrial Painting & Coating
“Five (5) Kilometer 8″ CS Pipeline at PetroChemical Plant. Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Client: Khaled Juffali Industrial Company (KJIC)
End User: Sadara Petro-Chemical Complex
Categories: Mechanical
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Two (2) Number Water Storage Tanks Height 8 meters Diameter 15 Meters Surface Preparation and Painting work has been done at Site Location. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: SADAF Expansion Project
Client: China National Chemical Engineering Third Construction Co. Ltd.
End User: Petrokemya North Petrochemical Plant - SABIC
Scope: Surface Preparation, Industrial Painting & Coating
“Fifteen (15) Kilometer 12″ – 26″ Pipeline for Petrochemical Plant. Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Cold Box Project
Client: Sendan
End User: Kemya Petrochemical Plant - SABIC
Scope: Surface Preparation, Industrial Painting & Coating
“Steel Structure approximately Five Hundred (500) Tons. Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Painting of Tanks & Vessels
Client: KNM
End User: Tasnee Chemical Plant
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Ten (10) Number Storage Tanks and Vessels Height/Length 15 meters Diameter 8 Meters Surface Preparation and Painting work has been done at Client Fabrication Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Client: Sendan
End User: Samref Refinery (Yanbu) - Saudi Aramco
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of eight (8) Tanks. Surface Preparation and Painting work has been done at Client Plant Site. The Job was executed during short time available during shutdown. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Client: Olyan Descon
End User: Saudi Aramco
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Fire Water Tank. Surface Preparation and Painting work has been done at Client Plant Site. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Client: Sendan
End User: Sharq Petrochemical Plant - SABIC
Categories: Mechanical
Scope: Surface Preparation, Industrial Painting & Coating
“Five (5) Kilometer 1″ – 12″ Pipeline for Petrochemical Plant. Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: New Hospital Building in Khobar
Client: Masseco
End User: New Hospital Building in Khobar
Scope: Surface Preparation, Industrial Painting & Coating
“Three (3) Kilometer 1″, 2″, 4″, 6″, 8″, 10″, 12″ and 24″ Pipeline. Steel Structure and Lose Fittings approximately Hundred (100) Tons. Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope+B4”
Project Title: SABIC New Buidling Project
Client: Zamil Coolcare
End User: SABIC
Scope: Surface Preparation, Industrial Painting & Coating
“Fifteen (15) Kilometer 1/2″, 1″, 2″, 4″, 6″, 8″ and 10″ Pipeline Water Line. Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Plant Expansion Project
Client: Sendan
End User: Maaden - Aluminum
Scope: Surface Preparation, Industrial Painting & Coating
“Four (4) Kilometer 6″ Pipeline. Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope”
Project Title: Water Pipeline Painting Project
Client: AGCE
End User: Marafiq
Scope: Surface Preparation, Industrial Painting & Coating
“Six (6) Kilometer 4″ Pipeline Water Line. Surface Preparation and Painting work has been done at Experts Arabia Fabrication and Painting Facility. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope.”
Project Title: Painting of Reactor No 6
Client: Sendan
End User: Al Razi Plant - SABIC
Scope: Surface Preparation, Industrial Painting & Coating
“Surface Preparation and Painting of Reactor No 6 Surface Preparation and Painting work has been done at Client Plant Site. Client Coordination, QC Reports and Inspection Assistance, Progress Reporting, Logistics all included in our scope.”
Projects Categories
all
e&i